A-MAE-ZING UPDATES!
June Blooms 🌻
Things are really cruising over at Mae House! And with the official start of summer on Sunday, we have lots of sunny days ahead. The Mae House girls are happy and healthy and ready for a fun summer filled with pool and beach days, neighborhood walks + spending quality time together.
Scroll down to check out a few of the latest photos from the new build. Thank you for following along and being a part of this A-MAE-ZING journey with us!
Construction Updates + Big Thanks to our Subcontractors:
-
Framers (J.D. Wells): pick up framing, blocking and edging
-
Plumbers (C.W. Plumbing): installing waste and water lines, prepping for gas piping
-
HVAC (Schaef Air): installing ducting, air handlers, intakes and returns
-
Central Vacuum (The Vac Dudes): system rough in
-
Low voltage (Intec): rough in for security and internet
-
Electrical (Mancha Electrical): installing panels, j boxes and running wire
-
Drywallers (DCL): installing resilient channels and dens glass
-
Insulators (OJ Insulation): insulation of shear walls and out of sequence areas















A few weeks ago, the girls had the opportunity to go on a bay cruise, thanks to Kathryn and Rich Tait, on their boat “Good News”
What a wonderful time they all had! Thank you to the Taits!
Love, Carrie, Gina, Hannah and Tanette





Tagged with